Lifting of cast discharge head only (without Vertical Turbine Pump assembly components)
Lift the cast discharge heads (without pump assembly components) by installing eyebolts as
shown thru the driver mounting flange holes.
Do not use the lift pins at the base of the discharge head while lifting the cast discharge
head only unless the discharge head is secured by slings to prevent overturning. Never lift the
complete Vertical Turbine Pump assembly with eyebolts through the driver mounting flange.
Lifting of cast discharge head with Vertical Turbine Pump complete/partial pump assembly
Cast discharge heads with attached Vertical Turbine Pump components are recommended to be lifted using lift pins sized in accordance with the pump weights provided on the general arrangement and/or nameplate. Alternative lift method would be to use minimum of two straps on the cast discharge head, placing each strap around two ribs on the head.
The slings are attached to the lift pin shall maintain a minimum 12-inch length of the sling from the shaft end as shown in the detail below.
Vertical PWDDFL Multi-suction Sewage Sump Pump
VS6 Vertically Suspended Radial Canned Turbine pump
Vertical turbine Industrial Can-Type Pumps
Semi-submersible Vertical Industrial Turbine Pumps
Semi-submersible Canned Vertical Turbine pump
Short-Set Vertical Turbine pumps
Vertical Cryogenic Process Canned vertical turbine pump
Vertical Canned Process Semi-submersible turbine pump
Canned Vertical Turbine Generators Pump
Vertical long shaft turbine pumps
Semi-submersible Mixed-Flow Vertical Turbine Pumps
Vertical Semi-submersible chemical sump pump
TEL:073184800558 073184810558
Cell Phone:008618507312158 008613974960765
E-mail:sale@ljpump.net
Address:Xiangyin Industrial Park, Jinlong Town, Xiangyin County, Hunan Province, China